Please bear with us. The site is still undergoing maintenance and enhancement procedures.

ZAMSURECO-I

Power Advisories

NGCP Schedule Power Interruption (AUGUST 12, 2023) between 8:00 AM - 5:00 PM
NGCP SCHEDULE POWER INTERRUPTION Date: AUGUST 12, 2023 (SATURDAY) Time: 8:00 AM - 5:00 PM Duration: 9 HOURS   Affected area/s: • UPPER BAYAO Substation • TIGUMA Substation • STA. MARIA Substation • BALANGASAN Substation • SAN MIGUEL Substation   Municipalities affected: •PAGADIAN CITY •LABANGAN •DUMALINAO •TIGBAO •GUIPOS •SAN PABLO •SAN MIGUEL •LAPUYAN •DIMATALING •DINAS •VINCENZO SAGUN •MARGOSATUBIG •PITOGO •TABINA •Portion of AURORA, ZDS -Brgy. Lubid -Brgy. Lantungan -Brgy. Inroad -Brgy. Resthouse •Portion of the municipality of TUKURAN, ZDS -excluding brgys: x Navalan x Laperian x Buenasuerte x Sambulawan   Reason/s of Interruption: 1. NGCP will conduct transmission line maintenance along Aurora-San Miguel 69kv Line.   As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption. Thank you.
Aug 08th , 2023 Read More
Schedule Power Interruption (AUGUST 3, 2023) between 9:00 AM - 5:00 PM
SCHEDULE POWER INTERRUPTION Date: AUGUST 3, 2023 (THURSDAY) Time: 9:00 AM - 5:00 PM Duration: 8 HOURS   Affected Areas in: MUNICIPALITY OF AURORA: •Brgy. Commonwealth •Brgy. Baki •Brgy. Panaghiusa •Brgy. Kahayagan East & West •Brgy. Monte Alegre •Brgy. Montela •Brgy. Balintawak MUNICIPALITY OF TUKURAN: •Brgy. Navalan •Brgy. Sambulan •Brgy. Buenasuerte   Reason/s of Interruption: 1. Upgrading conductor from 2/0 to 4/0 from Brgy. Hall Commonwealth to kahayagan East Aurora ZDS. 2. Replacement of Small insulators from Brgy. Monte Alegre to Balintawak Aurora ZDS. 3. Clearing of power line along affected areas.   As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this schedule power interruption. Thank you.
Jul 31st , 2023 Read More
Schedule Power Interruption (JULY 29, 2023) between 8:00 AM - 5:00 PM
SCHEDULE POWER INTERRUPTION Date: JULY 29, 2023 (SATURDAY) Time: 8:00 AM - 5:00 PM Duration: 9 HOURS   Affected Areas: •Entire Municipality of Vinzenzu Sagun •Parts of Brgy. Lumbog, Margosatubig •Brgy. Limamawan, Margosatubig   Reason/s of Interruption: 1. ZAMSURECO-I will conduct continue pay-outing of center phase 4/0 conductors from C8 katipunan to C8 cogon and line conversion from VEE-Phase to 3-Phase and primary reconductoring from #2 to 4/0 from C8 cogon to C8 kapatagan, V-San and Clearing of Powerlines.   As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this schedule power interruption. Thank you.
Jul 27th , 2023 Read More
Schedule Power Interruption (JULY 22, 2023) between 3:00 AM - 6:00 AM
SCHEDULE POWER INTERRUPTION Date: JULY 22, 2023 (SATURDAY) Time: 3:00 AM - 6:00 AM Duration: 3 HOURS Affected Feeder: • Danlugan feeder   Affected Areas: •Pagadian City (•Brgy. Danlugan •Brgy. Tulangan •Brgy. Kalasan •Brgy. Kagawasan •Brgy. Kahayagan •Brgy. Alegria •Brgy. Datagan •Brgy. Bogo •Portion of Brgy. Manga •Brgy. Gubang •Brgy. Dao) •Municipality of labangan: (•brgy. bagalupa brgy. langapod)   Reason/s of Interruption: 1. To facilitate the correction vertical clearance of our backbone line (safety) 2. To correct the hotspot at the tapping pole of ZDSMC hospital, dao, p.c (system loss reduction)   As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this schedule power interruption. Thank you.
Jul 21st , 2023 Read More
Schedule Power Interruption (JULY 21, 2023) between 9:00 AM - 5:00 PM
SCHEDULE POWER INTERRUPTION Date: JULY 21, 2023 (FRIDAY) Time: 9:00 AM - 5:00 PM Duration: 8 HOURS Affected Areas: •Part of Dipolo Molave, Brgy. Blancia, Brgy. Rizal, Molave and Entire Municipality of Tambulig except. Brgy. Maya-maya, Pelocuban, Balugo and Sagrada Familia, Tambulig, Dumingag ZDS.   Reason/s of Interruption: 1. Massive clearing of Powerlines of Acacia trees branches from Blancia Molave to Gabunon Tambulig ZDS. 2. Relocation of Pole at Dipolo Daku, Molave due to construction of new bridge.   As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this schedule power interruption. Thank you. .
Jul 20th , 2023 Read More
Schedule Power Interruption (JULY 22, 2023) between 8:00 AM - 5:00 PM
SCHEDULE POWER INTERRUPTION Date: JULY 22, 2023 (SATURDAY) Time: 8:00 AM - 5:00 PM Duration: 9 HOURS Affected Areas: •Entire Municipality of Vinzenzu Sagun •Parts of Brgy. Lumbog, Margosatubig •Brgy. Limamawan, Margosatubig   Reason/s of Interruption: 1. ZAMSURECO-I WILL CONDUCT LINE CONVERSATION FROM VEE-PHASE TO 3-PHASE AND PRIMARY RECONDUCTORING FROM #2 TO 4/0 FROM C8 KATIPUNAN TO C8 COGON, V-SAGUN.   As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the schedules works. Please take the necessary preparations and precautions in anticipation of this schedule power interruption. Thank you.
Jul 18th , 2023 Read More
Schedule Power Interruption (JULY 15, 2023) between 8:00 AM - 5:00 PM
SCHEDULE POWER INTERRUPTION Date: JULY 15, 2023 (SATURDAY) Time: 8:00 AM - 5:00 PM Duration: 9 HOURS  Affected Areas: •Entire Municipality of Vinzenzu Sagun •Parts of Brgy. Lumbog, Margosatubig •Brgy. Limamawan, Margosatubig   Reason/s of Interruption: 1. ZAMSURECO-I WILL CONDUCT LINE CONVERSATION FROM VEE-PHASE TO 3-PHASE AND PRIMARY RECONDUCTORING FROM #2 TO 4/0 FROM C8 BOUNDARY V-SAGUN AND MARGOSATUBIG TO C8 COGON, V-SAGUN AND CLEARING OF POWERLINES.   As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the emergency works. Please take the necessary preparations and precautions in anticipation of this schedule power interruption. Thank you.
Jul 14th , 2023 Read More
Schedule Power Interruption (JULY 8, 2023) between 9:00 AM - 5:00 PM
SCHEDULE POWER INTERRUPTION Date: JULY 8, 2023 (SATURDAY) Time: 9:00 AM - 5:00 PM Duration: 8 HOURS     Affected Areas: •Entire Municipality of Vinzenzu Sagun •Parts of Brgy. Lumbog, Margosatubig •Brgy. Limamawan, Margosatubig   Reason/s of Interruption: 1.ZAMSURECO-I will conduct 3-phase primary reconductoring from 1/0 to 4/0 from C4 lumbong, Margos to C8 boundary V-Sagun and Margosatubig, center phase pole dressings and clearing of powerlines.   As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the emergency works. Please take the necessary preparations and precautions in anticipation of this schedule power interruption. Thank you.
Jul 07th , 2023 Read More
Schedule Power Interruption (JULY 7, 2023) between 9:00 AM - 5:00 PM
SCHEDULE POWER INTERRUPTION Date: JULY 7, 2023 (FRIDAY) Time: 9:00 AM - 5:00 PM Duration: 8 HOURS   Affected Entire Municipality: •RAMON MAGSAYSAY • MIDSALIP •TAMBULIG (EXCLUDING BRGYS: PELOCUBAN, BAG-ONG KAUSGWAGAN, LIBATO, BAG-ONG TABUGON, LOWER LIASON, UPPER LIASON AND UPPER DUMALINAO) •SOMINOT (EXCLUDING BRGYS: LANTAWAN AND NEW OROQUITA SOMINOT) AFFECTED AREAS AT MOLAVE: •BRGY. DIPOLO •BRGY. RIZAL •PART OF BRGY. BLANCIA •PART OF BRGY. SUDLON AFFECTED AREAS AT AURORA: •PORTION OF CAMPO III   Reason/s of Interruption: 1. TO EVALUATE AND CORRECT HOTSPOT AT SWITCH SUBSTATION 2. LINE MAINTENANCE RIDE ON ACTIVITY OF DISTRICT III: A. REPLACEMENT OF ROTTEN POLE C1 STRUCTURE AT PRK. 2 SINAGUING RM B. CLEARING ALONG AFFECTED POWER LINE 3. LINE MAINTENANCE RIDE ON ACTIVITY OF DISTRICT 1 (MOLAVE): A.INSERT POLE C1/C7 STRUCTURE CINEMA TAPPING POLE AT BLANCIA MOLAVE B. CLEARING ALONG AFFECTED POWER LINE 4. LINE MAINTENANCE RIDE ON ACTIVITY OF DISTRICT 1 (TAMBULIG): A. POLE RELOCATION AT RIVERSIDE TAMBULIG (DONGGAY REQUEST) - 1PC B. REPLACEMENT OF ROTTEN POLE C1 STRUCTURE AT LOWER LODIONG TAMBULIG C. CLEARING ALONG AFFECTED POWERLINE.   As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption. Thank you.
Jul 06th , 2023 Read More
Emergency Power Interruption (JUNE 16, 2023) between 9:00 AM - 5:00 PM
EMERGENCY POWER INTERRUPTION Date: JUNE 16, 2023 (FRIDAY) Time: 9:00 AM - 5:00 PM Duration: 8 HOURS   Affected Areas in Tukuran: •Entire Brgy. of Man-ILan •Entire Brgy. of Manlayag •Portion of brgy. tabuan   Reason/s of Interruption: 1.To conduct massive vegetation clearing, replacement of old insulators and reconductoring from bare wire to insulated tree wire. (The activities are form part to address the reported frequent interruption in the area of Tukuran.)   As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the emergency works. Please take the necessary preparations and precautions in anticipation of this emergency power interruption. Thank you.
Jun 16th , 2023 Read More