NGCP SCHEDULED POWER INTERRUPTION Date: APRIL 12, 2023 (WEDNESDAY) Time: 6:00 AM - 6:30 AM Duration: 30 Minutes Affected area/s: • UPPER BAYAO Substation • TIGUMA Substation • STA. MARIA Substation • BALANGASAN Substation • SAN MIGUEL Substation Municipalities affected: •PAGADIAN CITY •LABANGAN •DUMALINAO •TIGBAO •GUIPOS •SAN PABLO •SAN MIGUEL •LAPUYAN •DIMATALING •DINAS •VINCENZO SAGUN •MARGOSATUBIG •PITOGO •TABINA •Portion of AURORA, ZDS -Brgy. Lubid -Brgy. Lantungan -Brgy. Inroad -Brgy. Resthouse •Portion of the municipality of TUKURAN, ZDS -excluding brgys: x Navalan x Laperian x Buenasuerte x Sambulawan Reason/s of Interruption: 1. NGCP will conduct brief interruption to facilitate load shifting to the 100MVA T1 Alstom Transformer for the offline verification test of the 100MVA T2 TBEA Transformer and for the re-tapping of switchgear No.02 at Aurora Substation. As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption. Thank you.